Skip to content
31.44°N 31.67°E — DAMIETTA

Every line under one roof

Production lines that move from raw material to packed, project-ready furniture — systematically.

WOOD LINE
01Solid Wood Production

Solid Wood Production

Milling, joinery, and shaping lines built for contract volume — from solid timber to engineered panels.

Materials
Kiln-dried beech, oak & panels
Tolerance
±0.5 mm on CNC-machined parts
Capacity
Contract batch runs
Lead time
4–6 wk typical
METAL LINE
02Metal Fabrication

Metal Fabrication

Cutting, bending, welding, and powder coating for frames, bases, and architectural metalwork.

Materials
Steel & aluminium — tube, sheet
Process
Cut, bend, weld
Finish
RAL-matched powder coat
Lead time
4–6 wk typical
UPHOLSTERY
03Upholstery

Upholstery

Frames, suspension, foams, and contract-grade textiles assembled to hospitality durability specs.

Materials
Contract textiles & foams
Standard
Hospitality durability specs
Capacity
Cut, sew & foam in-house
Lead time
4–6 wk typical
FINISHING
04Finishing & Assembly

Finishing & Assembly

Spray lines, surface control, and final assembly with inspection gates before packing.

Process
Spray, seal, surface control
QC
Inspection gates pre-packing
Packing
Export-ready cartons
Lead time
Scheduled per program

Have a spec to match.